Felida Glen Lot 1 for Kingston Homes

Framing on the house is complete. On to the shop next to the house… Getting close to done… Spot for a shop on the right… Sheeting the roof. Check out that huge vault! Workin’ away at this new, big house

Posted in Residential Construction, Work for Kingston Homes Tagged with: , , ,

Dunning Meadows Lot 24 for Kingston Homes

Dunning Meadows 24

Never did get a picture of just the finished framing on this house, but here is the completely finished home… They did it! From post and beam to truss-ready in one day. Way to go, guys! Framing in full force today!

Posted in Work for Kingston Homes Tagged with: , , ,

Clawson home in Battle Ground

20150918_152628

This house is just about ready to move into. Take a look… Love the stripes the Clawsons chose to add to the gables! Very elegant-looking kitchen! Cozy fireplace Downstairs guest bathroom Love this front door! Hallway Spacious master bedroom Master

Posted in Residential Construction Tagged with: , ,

Discovery Ridge Lot 9 for Urban NW Homes

Prime didn’t frame this one, but we installed the siding…

Posted in Residential Construction Tagged with: , , ,

Hidden Meadows 24 Duplex for Marnella Homes

Another duplex for the books! Lookin’ good! Trusses! Moving right along… Lots of progress made… Started another duplex in Fisher’s landing! Lots of frame-time on this one…

Posted in Residential Construction Tagged with: , , , ,

Re-side for customer in downtown Vancouver

This was definitely a unique project! This customer imported special stained Brazilian teak wood to re-side this gable. Prime carefully installed the one-of-a-kind wood and also installed the sun at the top of the gable that the customer had special-made.

Posted in Residential Remodel Tagged with: , , ,

Dunning Meadows 28 for Kingston Homes

Bristol Ridge Lot 2

All done! Just wrapping up… Trusses! Less than two days later! Working quickly… Up it goes…

Posted in Residential Construction, Work for Kingston Homes Tagged with: , , ,

Dunning Meadows 23 for Kingston Homes

Finito! (excuse the finger shot) Switched to siding Lot 23… Two days later, and….voila! All done. Friday afternoon… Up it goes…

Posted in Residential Construction, Work for Kingston Homes Tagged with: , , ,

Mo Hollow 18 for Urban NW Homes

Back to side 18! 2 sides down, 2 to go…  And then there was a second floor…and a roof! Progress… New one going up!

Posted in Residential Construction Tagged with: , , ,

Mo Hollow 19 for Urban NW Homes

Siding in progress. Waiting on cedar to finish up the front.. Finishing up the back patio cover… I must have blinked! Almost done… New one in the neighborhood…

Posted in Residential Construction Tagged with: , , ,